¥ 250.00 922-111 Exam
Communication Server 1000 to Rls.6.0 Upgrades for Technicia
- 科目编号:922-111
- 科目名称:Communication Server 1000 to Rls.6.0 Upgrades for Technicia
- 考题数目:27 Q&As
- 更新日期:2011-10-24
- 价 格 :
¥ 655.00250元RMB
免费下载 922-111 认证资料Demo
选择 pass4side 922-111 资料
922-111 考试是 Nortel 公司的 Communication Server 1000 to Rls.6.0 Upgrades for Technicia 认证考试官方代号,pass4side 的 922-111 权威考试学习资料经过多名专业Nortel 认证工程师整理测试,pass4side 绝对保证第一次参加 922-111 考试的考生即可顺利通过,否则承诺免费更新!
1、Pass4Side考题大师922-111学习材料是您获取认证的完美组合,覆盖率极高,只要您使用本站的考试学习材料参加922-111 考试,您将一次轻松通过考试;
2、售后服务第一!我们相信要想在当今时代取得成功,必须为广大用户提供全套的周到细致的全程优质售后服务,只有客户满意了,我们才能发展。客户至上是我们Pass4Side考题大师的一贯宗旨;
3、Pass4Side实行“一次不过免费更新”承诺。如果您购买我们922-111的考题,只要不是首次通过,凭盖有PROMETRIC或VUE考试中心钢印的考试成绩单,我们将免费更新922-111最新学习材料,绝对保证您能继续获得有价值的学习材料;
4、本站922-111学习资料根据922-111知识点的的变化动态更新,在厂家知识点每次发生变化后,我们将尽快更新922-111材料知识点。在您购买我们的产品之后,我们将提供30天的免费更新。确保922-111学习材料的覆盖率
5、软件版本922-111 考试资料
优点:具有学习模式,测试模式,线上自动升级
缺点:仅限固定电脑使用,不可打印为文本,只能PC阅读
6、PDF 格式922-111 考试资料(部分最新更新科目已不提供PDF)
优点:不需下载安装软件,方便用户打印和携带,但也带来了可随意制的弊端,因此我们提醒用户不得随意公开或出售本站的922-111资料,一经发现立即取消其升级资格,且永久删除会员。
缺点:不具备测试模式,通过查看 pass4side.cn网站及查收我们的更新E-MAIL获取更新信息。
Exam : Nortel 922-111
Title : Communication Server 1000 to Rls.6.0 Upgrades for Technicia
1. A customer with a Communication Server (CS) 1000E Rls. 5.5 HA system with two IPMGs and dual CPPM Signaling Servers is upgrading their system to release 6.0. The system is part of an IP Peer Network that includes a NRS database. Which upgrade step is correct?
A. Use NRS Manager to download the NRS backup file to a compact flash.
B. Use Element Manager to download the Signaling Server backup file to a compact.
C. User NRS Manager to download the NRS backup file to the local PC.
D. Use Element Manager to download the Signaling Server backup file to the local PC.
Answer: C
2. Click on the Exhibit button.
You are upgrading a single site Option 11C Rls. 5.5 system to a Communication Server 1000E Rls. 6.0 Standard Availability with a single IP Media Gateway (MG) 1000E chassis. The customer is using a CPPM card from inventory as a CPPM Co-Resident Call Server and Signaling Server.
Based on the output received when the card boots up, shown in the exhibit, what must done before Linux Base can be loaded?
A. the Low Memory must be doubled
B. the BIOS must be updated from version 74 to version 18
C. the BIOS must be updated from version 14 to version 18
D. the Extended Memory must be doubled
Answer: C
3. A customer with an existing Option 11C Rls. 5.5 chassis system is planning to upgrade to a Communication Server 1000E Rls. 6.0 Standard Availability. A CPPM Co-Resident Call Server and Signaling Server card will be installed. The system will automatically map small system Terminal Numbers to large system Terminal format during the upgrade. In this upgrade scenario, which actions must be completed manually? (Choose two.)
A. Re-programming Digital Trunk Terminal Numbers with a new format.
B. Programming the DSP daughterboards on the IP Media Gateway.
C. Entering the IP address for each IP Media Gateway in LD 97.
D. Re-programming Tone Receiver Terminal Numbers with a new format.
Answer: BC


客户反馈
认证是一个过程,选对好的题库能把过程缩短,节省我们的时间和精力,推荐Pass4side
Booth - 2010-11-17 12:45:00